High Speed Automatic High Level Empty Glass Bottle Depalletizer
Contact Supplier
Product Highlights
- High Automation Level: Fully automatic operation with PLC control for reliable and efficient depalletizing.
- High Production Capacity: Capacity ranges from 10,000 to 50,000 bottles per hour suitable for large-scale production.
- Customizable Pallet Size: Pallet size can be adjusted according to specific customer requirements.
- Comprehensive Safety Features: Equipped with safety guardrails, photoelectric switches, and automatic protection against failures.
- Versatile Application: Ideal for depalletizing various glass bottles and cans with multi-variety production support.
- Durable Mechanical Design: Uses TR bearings and motor-driven lifting mechanisms for stable and long-lasting performance.
- Flexible Partition Mechanism: Optional manual or automatic partition placement mechanism selected by the customer.
- Low Contamination Risk: Designed to prevent glass bottles from contamination and reduce damage during handling.
Product Attributes
- Customization
- Available
- Type
- Horizontal Depalletizer
- Automatic Grade
- Automatic
- Capacity
- 10000-50000 Bph
- Maximum Load Per Layer
- 250kg
- Maximum Load Per Pallet
- 1500kg
- Maximum Stack Height Per Stack
- 1800mm
- Installing Electricity
- 20kw
- Use Air Pressure
- 7 Bar
- Air Consumption
- 200L/Min
- Equipment Weight
- About 5.5t
- Diameter
- About 2.4m*1.7m*4.5m (Length*Width*Height)
- Pallet Size
- According to Customer Requirements
- Transport Package
- Glass Bottle
- Specification
- 10000-50000 BPH
- Trademark
- Haopak
- Origin
- China
- HS Code
- 8428909090
- Production Capacity
- 50 Sets/ Year
Product Images of High Speed Automatic High Level Empty Glass Bottle Depalletizer
Find Similar Products
Product Description
1.0 Product Introduction
1.1 General description
This machine is mainly composed of bottle conveyor, lifting mechanism, bottle clamping and transferring mechanism, bottle collecting platform, bottle blocking mechanism, layer plate suction and release mechanism, empty pallet conveying mechanism, board bin machine, layer plate conveying mechanism, full pallet conveying mechanism, manual platform, safety protection device and automatic control system.
The horizontal depalletizer is a special equipment for depalletizing various bottles and cans. It has the characteristics of high automation, reliable operation, and is suitable for large-scale and multi-variety production. It is an ideal equipment for eliminating backward packaging technology; it can improve the degree of automation; reduce the labor intensity of workers; prevent glass bottles and cans from being contaminated and reduce damage.
1.2 Machine operation steps
The bottle conveyor conveys the glass bottle stack to the center of the depalletizer, the array, and the photoelectric switch for detecting the full warehouse sends a signal, the bottle blocking mechanism is lifted, and the bottle collecting platform conveys the bottle array to the depalletizer bottle transfer frame. The front baffle cylinder of the bottle transfer frame moves to close the array, and the bottle transfer frame moves the array as a whole to the depalletizing position - above the pallet, and the baffle cylinder lifts the array and drops it onto the collection platform.
Then the bottle transfer frame returns to the initial position. The lifting mechanism will automatically drop one layer after each unloading, and the automatic unloading partition mechanism will suck up the empty plate and put it on the work station, repeating this action until the whole stack of products is unloaded.
When the unloading completes a set pallet height, the machine adopts PLC control, and the detection original is randomly controlled at any time, so as to ensure its normal operation and automatic protection against unexpected failures. And the packing speed can be adjusted according to the needs of production volume.
2.0 Main Technical Features Of The Machine
2.1 Technical parameters
| Capacity | 10000-50000BPH |
| Maximum load per layer | 250kg |
| Maximum load per pallet | 1500kg |
| Maximum stack height per stack | 1800mm |
| Installing Electricity | 20kw |
| Use air pressure | 7 bar |
| Air consumption | 200L/min |
| Equipment weight | About 5.5T |
| Diameter | About 2.4m*1.7m*4.5m (length*width*height) |
| Pallet size | According to customer requirements |
2.2 Main Features
1. Chain conveyor is used in the full stack input area
2. TR bearing is used for the bottle stacking machine bearing
3. Motor drive is used for the main lifting mechanism
4. Motor drive bottle clamping slide plate group
5. Automatic empty pallet supply mechanism
6. Chain conveyor is used in the stacking area
7. A set of full stack positioners
8. Manual/automatic partition placement mechanism (selected by the customer) (Note: automatic can be used for flat plates. Framed partitions can be automatically unloaded while ensuring neat stacking)
9. Empty pallet supplier (selected by the customer)
10. Surrounding safety guardrail device
2.4 Layout

Hao Pak Machinery was established in 1998, one of the earliest manufacturer for beverage filling machines in China. Well Machinery is located in Zhangajigang City, Jiangsu Province, about 2 hours drive from Shanghai International Airports, workshop covering more than 10,000 square meters, total about 150 employees with a more than 30 professional technical engineers to design and develop advanced machines. Hao Pak co integrates design, develop, research, design, manufactuere, technology service and marketing to provide complete set machines for water, beverages, alcohol drinks and dairy drinks. Hao Pak Co is adhering the principle of " Quality First, Service Gurantee". Clients' needs are the top important goal, which guides a way for daily work.
Hao Pak Machinery has a sale network of customers for complete filling lines more than 500 lines, spreading more than 30 provinces in China, USA, UK, Japan, Korea, Middle East Area,South Aisa countries, and also African countries. Hao Pak Machinery has served machines or service to Coca-cola, Fiji Water, Danone, Abiba, FANNY, DONGPENG, GUANGMING,VITA MILK, Snow Beer, Panpan Group, C'eston, Bidrico and other famous brands in China and abroad.

Q: How about the spare parts?
A: We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
Q: How long time for installation?
A: According your machines order,we will send one or two engineers to your plant for installation, it will take about 10 days to 25 days.
Q: How to install my machines when it arrives? how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back, accommodation and USD80/day/person.
Q: When can I get my machine after I paid?
A: Normally production time is around 30-60days, the exactly date depend on what kind of machine you order. The shipping time is based on your destination port.
Q: What's your guarantee or the warranty of the quality if we buy your machines?
A: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q: Are you a trading company or a manufacturer?
A: We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.
About the Supplier
This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASI234366". Items marked "" are certified.
Company Profile
Zhangjiagang Hao Pak Machinery Co., Ltd., located in China's "golden waterway", at the southern bank of the middle and lower reaches of the Yangtze river in Zhangjiagang city, Jiangsu province. She is surrounded by Shanghai, Nanjing, Suzhou, Wuxi and other cities ring. Well is the collection research, manufacturing, service as one of the beverage machinery professional manufacturers. Hao-pak puts the main energy into professional technology domain- beverage packaging machinery, upstream and downstream related both beverage packaging equipment research and development. Well aims at the world's most advanced beverage packaging machinery technology, combined with domestic and foreign advanced beverage packaging machinery technology, adhering to the technical service the customer's idea, to conduct a comprehensive development research, products has great market competitive advantage.
Hao-pak can provide users with: Market positioning analysis, process configuration of equipment, personnel training, etc. A set of turnkey engineering and related services.
What Hao-pak can do:
★ 1, 000~36, 000BPH Carbonated Beverage Bottling Line;
★ 1, 000~36, 000BPH Still Purified Water/ Mineral Water Bottling Line;
★ 1, 000~36, 000BPH Tea/Juice Bottling Line;
★ 1, 000~36, 000BPH Milk/Dairy Bottling Line;
★ 1, 000~36, 000BPH White/red Alcohol Drink Bottling Line;
★ 1, 000~18, 000cans/H cans Beverage Bottling Line;
★ 100~2, 000 Barrels/H, 3~5 Galon Bottling Line;
★ Blow Moulding Machine From 1000~24000BPH;
★ Water Treatment System;
★ Shrink-Wrapper Machine
★ Paper Carton Packing Machine
★ Palletizer: Mechanical-Robot
★ Turn key projects meantime.
About Our Factory & Business Background
- Address
- No. 310, Renmin Road, Leyu Town, Zhangjiagang City, Suzhou, Jiangsu, China
- Terms of Payment
- LC, T/T, PayPal, Western Union
- International Commercial Terms(Incoterms)
- FOB, EXW, CFR, CIF, DDP, DAP
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month - Nearest Port
- Shanghai Port
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2010-03-01
- Main Markets
- North America, South America, Southeast Asia, Africa, Mid East, Eastern Asia
FAQ
- How about the spare parts?
- We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
- How long time for installation?
- According your machines order,we will send one or two engineers to your plant for installation, it will take about 10 days to 25 days.
- How to install my machines when it arrives? how much the cost?
- We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back, accommodation and USD80/day/person.
- When can I get my machine after I paid?
- Normally production time is around 30-60days, the exactly date depend on what kind of machine you order. The shipping time is based on your destination port.
- What's your guarantee or the warranty of the quality if we buy your machines?
- We offer you high quality machines with 1 year guarantee and supply life-long technical support.
- Are you a trading company or a manufacturer?
- We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.
Send your message to this supplier
People who viewed this also viewed
-
US$20,000.00-35,000.00 / Piece
-
US$20,000.00-35,000.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Other Machine
- Others Other Machine
- High Speed Automatic High Level Empty Glass Bottle Depalletizer
Related Categories
Hot Searches
- Packing Machine Factories
- Glass Bottle Factories
- Automatic Packaging Machine Factories
- Bottle Filling Machine Factories
- Automatic Bottle Machine
- Automatic Bottle Packing Machine
- Glass Bottle Packing Machine
- Packing Machine For Glass Bottle
- Glass Bottle Packaging Machine
- Depalletizer Bulkbuy